Control Configuration and Control Enactment in Information Systems Projects: Review and Expanded Theoretical Framework

The control of information systems (IS) projects is a key activity for deployment of information technology (IT) resources and ultimately for value creation through IT. For the last 20 years, research on IS project control has grown to cover a wide range of aspects and issues, including control modes, amounts, and portfolios, control in internal and outsourced settings, and control antecedents, consequences, and dynamics. There is an important theoretical and practical impetus for this research, since the nature of IS projects creates specific and challenging conditions for control, and since control research in neighboring disciplines often neglects temporary endeavors such as projects. In this study, we provide a systematic review and synthesis of the literature and develop an expanded theoretical framework for IS project control with supporting conjectures. Our review reveals that existing research primarily studies the contextual antecedents and performance consequences of control
http://aisel.aisnet.org/misq/vol40/iss3/13

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s